Checklist

Home electrification checklist.

A simple order for Adelaide homes that want EV charging, solar, batteries, induction and better switchboard capacity.

Start my electrification plan ↗
Home electrification planning checklist flat lay for an Adelaide household
Order of operations

Plan the board first.

1
Assess the switchboard
Confirm capacity and spare ways.
2
Map future loads
EV, induction, heating, cooling and battery.
3
Choose the cable routes
Garage, roof, meter area and plant locations.
4
Stage the work
Bundle jobs to avoid duplicate labour.
Worth knowing

Why sequencing saves money

Electrifying a home in the wrong order means paying for the same access twice — opening a wall for cable, then opening it again six months later for a different circuit. Working out the full list of future loads before booking any one job lets your electrician plan cable routes and switchboard capacity once.

You don't need to install everything at once. You just need the board and the routes sized for the end state, so each stage builds on the last instead of working around it.

Australian home with solar panels and a Tesla charging in the driveway
FAQs

Checklist questions

?
Why does the switchboard come first?
Because every later upgrade depends on whether the home can support the load.
?
Can this work for renovations too?
Yes. Renovations are often the best time to electrify smartly.
?
Can I add a home battery later?
Yes. Plan the inverter, switchboard capacity and battery location during the solar design so storage can be added without unnecessary rework.

Electrify the home in the right order.

Request my quote ↗